UBIK Guide in use at Wien Energie

May 3, 2022 | News

As part of the pilot project in cooperation with our partner WienEnergie, the newly developed possibilities of UBIK Guide for Mixed Reality guidance within critical activities such as the activation of plant components in the Flötzersteig and Arsenal power plants were extensively tested. The video gives an insight into usages like content creation or handling in the plant with the HoloLens 2 (Trimble helmet variant).

 

About UBIK Guide

UBIK Guide is the new mixed reality tool developed by Augmensys, which guides the user through the entire work process and thus supports learning while working by means of holographic instructions. The instructions are individually adapted to the needs of the customer and are visually linked to the application location, which means that the employee can immediately see what work needs to be done at what time and in what location.

Maintainer 2017 – award ceremony at the Maindays 2017 in Berlin

    The safe feeling of having made a valuable contribution to the maintenance of the future and, of course, also the prospect of a trophy, have motivated us to submit an innovative project for the Maintainer 2017. The pilot project "Inspectionround using...

CeMAT Hannover, May 19th – May 23rd 2014

  The whole world of intralogistics at a single venue. The range of exhibits includes, complete plants, systems and accessories, continuous handling systems, robot logistics and much more. Program Event: CeMAT 2014 Start: 19th May 2014 End: 23th May 2014...

VINCI Energies invests in Augmensys

    Augmensys and VINCI Energies are intensifying their successful collaboration: VINCI Energies has acquired a minority stake in Augmensys, through its investment and managerial fund, INERBIZ. The French corporation and Augmensys have already been...

UBIK in the Tyra Redevelopment Project (TRP)

    The Project: UBIK Solutions ApS, trusted partner of Augmensys in the Nordic region, was awarded the contract for a mobile solution for offshore Maintenance and Inspection, as part of the Tyra Redevelopment Project (TRP). UBIK offers a platform that is...
Standorte

Augmensys GmbH

Schleppe Platz 5, 2/3
9020 Klagenfurt | Österreich

+43 660 70 80 805
office@augmensys.com

Augmensys GmbH
Development Branch

Lastenstraße 38, EG
4020 Linz | Österreich

+43 660 70 80 812
office@augmensys.com

Augmensys Deutschland GmbH

Loher Straße 1
58332 Schwelm | Deutschland

+49 2336 474 820
office@augmensys.com

Augmensys
Desenvolvimento de Software Ltda

Rua Lanciano, 60, Jardim Suzana
São Paulo 04784-190 | Brasilien

+55 11 98596 7860
office@augmensys.com